Scope of accreditation · Inspection
Technical supervision and construction inspection
Control quality at every stage of construction.
Obtain documented information on the conformity of the works performed. We check the works against the design and the applicable requirements, record the non-conformities identified and present you with the assessment results.
- Accreditation certificate
- GAC-IB-0299
- Body type
- Type A
- Standard
- ISO/IEC 17020:2012/2013
- Valid
- until 10.07.2028
01 · Subject of inspection
What we inspect
We attend the facility’s the process of construction, repair, installation, dismantling, reconstruction and restoration works and assess its conformity with the design and cost-estimate documentation and/or the established requirements. We also determine the energy efficiency conformity with the design.
Technical supervision is mandatory.
under the general rule is voluntary — helps you identify defects in good time and reduce the cost of rework.
Legal basis — the Code of Spatial Planning, Architectural and Construction Activity, Article 119. Matsne ↗ For a specific facility, the conditions must be checked against the version currently in force.
| Area | Subject of inspection |
|---|---|
| Conformity with the design | Conformity of the structural and other works performed with the approved design documentation |
| Normative conformity | Conformity with the applicable construction norms and technical regulations |
| Quantities | The volume of works actually performed in relation to the documentation submitted |
| Materials documentation | Verification of the accompanying documents — certificates, test protocols and acceptance records. This is a documentary check and does not replace laboratory testing. |
| Stages | Assessment of the performance of the works of the relevant stage and of their conformity with the established requirements, within the scope of the service |
02 · Result
What you receive
Inspection report
- the subject of inspection and the scope of services;
- the basis of assessment — which design, norms and requirements were applied;
- methods applied, visit dates and the sections inspected;
- Conformity assessment result — where this is provided for within the scope of services;
- non-conformities identified, with descriptions and evidence — photographic records, measurements, copies of documents;
- limitations of the assessment — what was not inspected and for what reason;
- Certification by an authorised person.
Where necessary, documentation relating to the stages is additionally drawn up in the manner established by legislation.
03 · Process
How an inspection is carried out
01
Defining the criteria
We define the assessment criteria on the basis of the applicable requirements and agree the scope of services.
02
Documentary review
Review of the design, cost-estimate and as-built documentation.
03
On-site inspection
Visual examination and measurements. We record the evidence with photographs and written records.
04
Reporting
Documenting the findings, non-conformities and limitations, and delivering the report.
Scheduled visits is determined taking into account the stages of the works, the risks and the applicable requirements. Re-inspection after the defect has been corrected is determined separately and does not replace a scheduled visit.
04 · Frequently asked questions
Legal basis and scope
Who is required to commission an inspection?
What ISO/IEC 17020 means — and what it does not
Scope of services
- The inspection result is based on the scope of assessment, the methods applied and the evidence collected.
- The company does not perform the works it independently inspects, nor does it take part in the design of the facility.
- Mandatory requirements are neither altered nor reduced by agreeing the scope of services.
- An inspection does not imply a predetermined favourable conclusion and provides no guarantee of an administrative decision — including a permit or commissioning.
05 · Related
Other services
The accreditation status of each service is indicated on the relevant page, in accordance with the annex to the scope of accreditation.
Normative documents and procedures TA-IP-04-19
- Construction norms and rules — SNiP, Part 3
- Construction norms and rules — SNiP, Part 4
- Technical regulations governing the construction sector in the territory of Georgia — №71 (2014)
- National standard of Georgia SST 72:2009 — motor roads for public use: geometric and structural requirements
- Technical regulation “On approval of national accessibility standards” — №732 (2020)
- Technical regulation — №41 (2016)
- Technical regulation on the minimum energy-efficiency requirements for buildings — №354 (2021)
- Technical regulation on the construction, operation, closure and aftercare of landfills — №421 (2015)
- Rules for the installation of electrical equipment — ПУЭ
- Technical regulation on the rules for the technical operation of power plants and networks — №434 (2013)
- Technical regulation on safety rules during the operation of electrical installations — №340 (2013)
- Rules for the protection of linear structures of electrical networks and protection zones — №366 (2013)
- TA-IP-04-19 — inspection methods and procedures
Source — scope of accreditation, certificate GAC-IB-0299 (updated 10.06.2026). View the scope (PDF) ↗
06 · Contact
Contact us
For the inspection of your facility — quality begins with the right decision.
Save time — submit your application online.
- Address
- Tbilisi, 14a Alexander
Kazbegi Avenue, 3rd floor - Phone
- +995 599 81 87 87
- [email protected]
- Legal name
- TIAG Auditescort LLC
- Identification code
- 205229439
- Accreditation certificate
- GAC-IB-0299