14a Alexander Kazbegi Avenue, 3rd floor, Tbilisi +995 599 81 87 87 [email protected]
AUDITESCORT — to the home page Inspection Body · Type A
On-site verification of the works performed

Scope of accreditation · Inspection

Inspection of completed works — Form No. 2

Pay only for confirmed works.

We determine the volume of works actually performed at the facility and compare it with the cost estimate and the act of completed works (Form No. 2).

Accreditation certificate
GAC-IB-0299
Body type
Type A
Standard
ISO/IEC 17020:2012/2013
Valid
until 10.07.2028
View the certificate (PDF) ↗

01 · Subject of inspection

What we inspect

We assess the conformity of the works performed with the design and cost-estimate documentation and/or against the established requirements, the procurement documents and the average market prices prevailing at the time of construction, against the acts of concealed works, visual examination of the facility (including photographic records) and against the measurement results.

Scope
The scope of inspection is determined based on the inspection objective, within the scope of accreditation.
What the inspection covers
AreaSubject of inspection
Actual quantitiesMeasurement of visible works and comparison with the cost estimate and the acts of completed works
ResourcesConformity of material consumption, labour costs and machinery with the normative and technical documents
Unit costsComparison with the cost estimate and invoices
Market pricesIn the absence of design documentation — comparison with average market prices
ChargesConformity of the amount of charges with the applicable normative acts

02 · Result

What you receive

Inspection report

  • the subject of inspection and the scope of services;
  • the basis of assessment — which design, norms and requirements were applied;
  • methods applied and inspection dates;
  • Conformity assessment result — where this is provided for within the scope of services;
  • non-conformities identified, with descriptions and evidence;
  • limitations of the assessment — what was not inspected and for what reason;
  • Certification by an authorised person.

03 · Process

How an inspection is carried out

01

Defining the criteria

We define the assessment criteria on the basis of the applicable requirements and agree the scope of services.

02

Documentary review

Review of the documentation submitted and comparison against the applicable requirements.

03

On-site measurement

Measurement of visible works and recording of evidence. Concealed works are assessed on the basis of documentation.

04

Reporting

Documenting the findings, non-conformities and limitations, and delivering the report.

04 · Scope and legal basis

What you should know

What the result shows
The report sets out the quantities actually established, their comparison with the documents submitted and the discrepancies identified. This provides an objective basis for discussion between the parties.

Scope of services

  • The inspection result is based on the scope of assessment, the methods applied and the evidence collected.
  • The company does not perform the works it independently inspects, nor does it take part in the design of the facility.
  • Mandatory requirements are neither altered nor reduced by agreeing the scope of services.
  • An inspection does not imply a predetermined favourable conclusion and provides no guarantee of an administrative decision.

05 · Related

Other services

The accreditation status of each service is defined by the annex to the scope of accreditation.

Normative documents and procedures TA-IP-03-17
  1. Construction norms and rules — SNiP, Part IV
  2. Unified norms and rates — ЕНиР
  3. Departmental norms for construction works — ВНиР
  4. Collection of zonal unit norms for repair and construction works — ВЗЕР
  5. Norms for restoration works on historical and cultural monuments — ССН
  6. Prices of construction resources (SRP) — Union of Construction Estimators
  7. of the Government of Georgia No. 241 of 1 June 2026 Resolution — technical regulation “Procedure for determining overhead costs, planned profit and other charges in the public procurement of construction works”
  8. “CPP — Construction Price Portal” — average market prices of construction resources
  9. TA-IP-03-17 — inspection methods and procedures

Source — scope of accreditation, certificate GAC-IB-0299 (updated 10.06.2026). View the scope (PDF) ↗

06 · Contact

Contact us

For the inspection of your facility — quality begins with the right decision.

Save time — submit your application online.

Application →

Address
Tbilisi, 14a Alexander
Kazbegi Avenue, 3rd floor
Phone
+995 599 81 87 87
Email
[email protected]
Legal name
TIAG Auditescort LLC
Identification code
205229439
Accreditation certificate
GAC-IB-0299